Reconstruction of existing premises, installation of new systems – lighting, power, ventilation, and air conditioning, diesel, compressed air, and control panels, Sofia
Construction of a new room within an existing production hall, Botevgrad
Construction of a cleanroom with an air shower and necessary installations, creation of new adjacent premises, Botevgrad
Reconstruction of an industrial building and construction of premises for the production of high-temperature sensors, Botevgrad